Selected Engineering Projects

Examples of our air conditioning and mechanical ventilation (ACMV) work, documented through site and equipment photographs.

View Selected Project References

Air Conditioning

Education · Singapore

Mitsubishi Electric VRF Installation at a Singapore Secondary School

Heng Tung installed a Mitsubishi Electric variable refrigerant flow (VRF) system at a Singapore secondary school. The installation included high-level indoor units in the multipurpose hall and insulated refrigerant pipe runs linking indoor and outdoor equipment.

Site
A multipurpose hall at a Singapore secondary school.
Work delivered
High-level indoor units, outdoor VRF units, insulated refrigerant pipework and controls.
What the photos show
Equipment positions, pipe routing and central and wired controls. The clips capture different stages of the installation.
A row of high-level VRF indoor units along the wall of a school multipurpose hall
Indoor units mounted at high level along the multipurpose hall.
A row of Mitsubishi Electric VRF outdoor units on raised supports
Outdoor units positioned together outside the building.
Insulated refrigerant pipe runs on supports along the multipurpose hall wall
Insulated refrigerant pipework and supports during installation.
A central controller next to rows of wired air conditioning controllers, with identifying details masked
Central and wired controls at the site. Identifying screen details have been removed.

Short clips from the project

Filmed on site at different stages of the installation. Tap a clip to watch. The footage is silent.

Equipment Delivery & Hall LayoutEquipment staged on site, followed by a view of the sports hall.Open clip
Pipework ContainmentMetal channels prepared to route and protect the refrigerant pipework.Open clip
Sports Hall Site ViewA look at the hall and the high-level work area.Open clip
Insulated Refrigerant Pipe RunsField footage of the pipe routing during installation.Open clip

Fans & Ventilation

Seletar, Singapore

Air Handling Unit (AHU) Retrofit

The project involved replacing the fan and motor assembly in an existing air handling unit. Heng Tung removed the original assembly, fitted new support brackets and installed electronically commutated (EC) plug fans within the existing AHU casing.

Existing equipment
An air handling unit with a fan and motor assembly that needed replacement.
Work delivered
Removed the original assembly, fitted support brackets and installed an EC plug fan array.
Retrofit approach
The new assembly was fitted inside the existing AHU casing. The photos show the installed array and its mounting panels.
An EC plug fan array mounted inside the existing air handling unit at the Seletar site
EC plug fan array installed inside the existing AHU casing.
Close view of EC plug fan inlet rings and mounting panels at the Seletar site
Detail of the fan inlets and mounting panels.

Equipment Installation · Singapore

Batch EC Fan & Junction Box Installation for New Carrier FCUs

Heng Tung carried out EC fan and junction box installation across multiple batches of new Carrier fan coil units (FCUs) in Singapore. The units arrived without fans fitted. Sanmu (SG) Pte Ltd supplied the EC fans, and Heng Tung provided the installation labour to fit the fans and junction boxes to the new units.

Rows of new Carrier fan coil units with EC fans visible in several cabinets
Multiple new Carrier FCUs during batch installation of EC fans and junction boxes.
Batch installation in progress across multiple new fan coil units. Silent video, 5 seconds.

Installation scope

Our team mounted the EC fans inside the FCU cabinets and fitted the junction boxes to the units. The work covered both single-fan and twin-fan configurations. This was part of the local assembly of new equipment, rather than the replacement of fans in existing units.

Batch installation on site

The work involved multiple units at a time, with different fan configurations across the cabinets. The wide site photograph shows the scale of the installation, while the close-ups show how the fans sit inside the cabinets and the labelled terminals within a fitted junction box.

Technician preparing the cabinet during installation work
A Heng Tung technician preparing an FCU cabinet for installation.
Twin-fan and single-fan FCU cabinets shown together
Twin-fan and single-fan configurations in separate FCU cabinets.
Overhead view of mounted EC fans inside two FCU cabinets
A top view of the fan position and mounting inside the FCU cabinets.
Close-up of labelled wires and terminals in a junction box
Labelled terminals inside a junction box fitted by Heng Tung.

For equipment suppliers and ACMV contractors, this case shows where Heng Tung fits into the delivery process. When new FCUs arrive without fans fitted, our team can handle the local installation of the supplied EC fans and junction boxes across multiple units.

Raffles Hospital · Pre-Retrofit Site Survey

Pre-Retrofit AHU Site Survey

Before retrofit works are specified, Heng Tung inspects the existing air handling units (AHUs), reviews available equipment data and records how the system is operating on site. At Raffles Hospital, the team surveyed the existing AHU arrangement and recorded pressure, duct airflow and air temperature to establish a baseline for evaluating retrofit options.

Project stage
Pre-retrofit survey of the existing AHU, fan arrangement and access.
Measured on site
Pressure, duct airflow and air temperature under the conditions present during the survey.
Why the readings matter
They establish a baseline for comparing retrofit options. This is survey evidence, not proof of post-retrofit performance.

Equipment and site conditions

Review the existing AHU, fan assembly, access and available equipment data.

Total static pressure

Record pressure readings at the survey test points and relate them to the existing airside system.

Airflow and temperature

Record duct airflow and air temperature to document operating conditions at the time of the survey.

Digital pressure instrument showing a field reading in pascals
Pressure instrument reading recorded during the total static pressure survey.
Site measurement screen showing duct volume flow and air temperature
Duct airflow and air temperature readings captured during the survey.
Handheld pressure meter at another survey test point
Handheld pressure measurement at a separate survey test point.
Duct volume flow and air temperature on a second survey instrument screen
Airflow and temperature readings captured at another survey test point.
Watch the 13-second silent site survey clip
Existing AHU casing and belt-driven fan assembly at the time of the survey.

This case documents the site survey only. It does not show a completed retrofit or post-retrofit performance.

Mechanical Ventilation · Ahmad Ibrahim Primary School

Classroom Ventilation Upgrade

Heng Tung upgraded an existing classroom at Ahmad Ibrahim Primary School to improve air exchange with the outdoors and help manage heat build-up during lessons.

The team installed four EC axial ventilation fans on metal mounting panels fitted into the upper sections of the existing window frames. A rotary speed controller allows school staff to adjust the fan speed as needed.

Four window-mounted EC axial fans across the classroom at Ahmad Ibrahim Primary School
Completed classroom installation showing the four EC axial ventilation fans.
Heng Tung technician fitting a metal fan mounting panel into an existing classroom window frame
Fitting a fan mounting panel to the existing window frame.
Rotary fan speed control dial in its wall-mounted enclosure
Rotary fan speed controller.

Heng Tung Project Experience

Selected Project References

Selected school and residential air conditioning, EC fan and mechanical ventilation projects. Linked references include site photographs and further details.

  • Ahmad Ibrahim Primary School — Classroom ventilation
  • Bidadari BTO Homes — Resident group-buy aircon installation for new BTO homes
  • Carrier FCU Batch Installation — EC fans and junction boxes
  • Choa Chu Kang Secondary School
  • Jurong Secondary School
  • Leedon Green — Resident group-buy aircon maintenance
  • Melody Spring @ Yishun — Resident group-buy aircon installation for new BTO homes
  • Parc Clematis — Resident group-buy aircon maintenance
  • Raffles Hospital — Pre-retrofit AHU site survey
  • Seletar — AHU EC fan retrofit
  • Swiss Cottage Secondary School
  • Tannery Lane Area — Resident group-buy aircon installation for new homes
  • The Clement Canopy — Resident group-buy aircon maintenance
  • Whistler Grand — Resident group-buy aircon maintenance
  • Yuhua Secondary School

Organising a resident group buy? See condo aircon maintenance options.

× Whatsapp Us Now!